Deregulation, Building Control, and the Accountability Gap

About This Record: Written from the firsthand experience of a UK builder working in the trade since 1970, this page documents how successive governments and the judiciary dismantled building control accountability between Anns v Merton (1977) and Murphy v Brentwood (1990).

Using statutory history, personal High Court and bankruptcy records (1979–1992), and formal correspondence with political leaders up to 2026, it exposes how the state gave public and private building inspectors total legal immunity while leaving ordinary builders and citizens to carry 100% of the financial ruin.

When you examine the combined actions of Parliament and the courts between 1984 and 1990, a clear pattern emerges: public oversight was dismantled into a private market, while the courts simultaneously closed the door on holding either public or private inspectors financially liable for getting it wrong.

1. Before Deregulation: Pure State Policing Without Accountability (1936–1979)

2. Privatising Oversight Without Accountability (The Building Act 1984)

3. Closing the Door on Redress (Murphy v Brentwood, Private Inspectors & Section 38)

4. The Taxpayer Double-Bind

5. The Asymmetric Trap: Shared Risk After Anns (1978) vs. Total Builder Liability

Public debate almost always frames building control deregulation solely around homeowners. In reality, dismantling inspector accountability created a one-sided legal trap that left small and medium-sized builders carrying 100% of the financial risk while regulators and private inspectors walked away untouched.

6. The Human Cost and Lasting Legacy

This division between state immunity and citizen liability did not happen by accident. Those in government and the judiciary knew the consequences of removing accountability from public authorities and placing the financial burden squarely onto ordinary builders and homeowners. By stripping away legal redress, the system knowingly created severe financial ruin, loss of livelihoods, and repossessions across the country—inflicting deep, lasting trauma that continues to fuel the mental health crisis experienced by affected families and tradespeople to this day.

What Official Inquiries Eventually Admitted

For forty years, those who pointed out that this was a deliberate systemic failure were largely dismissed or ignored. It was only after the Grenfell Tower Inquiry and Dame Judith Hackitt’s independent review (Building a Safer Future) that the state officially admitted the system was broken—acknowledging that deregulation, commercialised building control, and a lack of regulatory accountability had created a "race to the bottom" while leaving ordinary citizens to carry the risk.

A Firsthand Record: How the System Operated in Practice (1979–1992)

This is not merely legal theory. My own experience spans the exact period between Anns v Merton (1978)—when inspecting authorities were supposedly accountable for negligent approvals—and Murphy v Brentwood (1990), when the courts formally granted them total immunity.

Below is my factual record as a builder who followed every statutory procedure, built strictly to drawings approved by Building Control, and was left to bear 100% of the cost when both the Local Authority and the NHBC walked away from their own approvals:

  1. February 1979: Applied for NHBC membership.
  2. August 1979: Building Regulation application.
  3. November 1979: Building work commenced.
  4. November 1979: Approval of Building Plans. Building Plan Certificate Plan No W/2131/79 passed in accordance with s64 Public Health Act 1936.
  5. October 1980: Application for NHBC membership accepted and placed on probation.
  6. During Construction (1979–1981): Works inspected and approved at each stage by both the Local Authority and the NHBC.
  7. Circa April 1981: Formally entered onto the NHBC register.
  8. Completion (1981): Houses signed off by the Local Authority, rated, and sold.
  9. July 1981: House purchase completed on Plot 3.
  10. Circa February 1983: Complaint made by the purchaser of Plot 3 regarding first-floor joist deflection.
  11. 1988: Bankrupted as a direct result of the dispute and the strict liability placed solely upon me, despite both inspecting bodies having approved the plans and construction. — View the full Carne v Debono Case Record
  12. Circa 1991: Discovered that the first-floor joists specified on the Local Authority-approved working drawings were undersized.
  13. High Court (Post-Murphy): Applied to the High Court following discovery of the defective approved specification; leave to appeal was refused.
  14. House of Lords: Petitioned the House of Lords; leave to appeal was refused, cementing the total immunity of the approving bodies.
  15. 1992: My family home was sold and I was made homeless.

Throughout this entire ordeal and in the decades since, I wrote to every Prime Minister, complained to Members of Parliament, and wrote to the Queen. Nobody showed any interest at all.

Documented Correspondence with Political Leaders (2022–2026)

The two formal email records below illustrate both the ongoing misuse of taxpayer money on an unaccountable building control system and the standard procedural runaround offered by political leaders when confronted with the human consequences.